Apr 18, 2026
Housing Units Completed (2010)
67
0.0% vs 2009
0 units in 2009
Building permit applications (2010)
5,219
0.0% vs 2009
0 permits in 2009
Housing Units Applied For (2010)
3,058
0.0% vs 2009
0 units in 2009

Top Completed Permits by Housing Units Added

#1
1
Units
6241833-CN
7/26/2010
Construct attached accessory dwelling unit (ADU) addition to the north of existing single family residence per plan.
#2
1
Units
6242995-CN
8/9/2010
Construct interior alterations and establish basement accessory dwelling unit (ADU) in existing single family residence per plan.
#3
1
Units
6243498-CN
9/2/2010
Alterations to establish 6th apartment unit in existing apartment building and occupy per plan
#4
1
Units
6246652-CN
6/10/2010
Alterations to lower level of single family residence to create an accessory dwelling unit per plan.
#5
1
Units
6244450-CN
8/19/2010
Establish detached accessory dwelling unit (DADU) and convert detached garage into dwelling unit per plan.
#6
1
Units
6228380-CN
9/28/2010
alterations to add 1-unit to existing apartment building per plan
#7
1
Units
6248829-CN
12/27/2010
Construct loft addition in existing accessory structure and create detached accessory dwelling unit to the east of existing single family residence per plan.
#8
1
Units
6196213-CN
9/8/2010
Establish use as single family residence and construct one family dwelling per plans
#9
1
Units
6237508-CN
3/15/2010
Establish ADU in basement of existing single family residence per plan.
#10
1
Units
6188190-CN
7/8/2010
Construct alterations to add one parking space and one unit in basement of existing apartment building and occupy per plans.