| 6530812-PH | 12/9/2016 | 12/12/2022 | Phased project: Construct south residential tower and commercial base and below grade structure occupy per plan. Mechanical included. (Construct mixed-use building with two residential towers and below grade parking/review and process 2 Records under 6530812-PH.) | 680 | Completed | New |
| 6578497-PH | 12/21/2017 | 2/13/2023 | Phased project: Construction of a residential office and retail building with below grade parking and occupy per plan. | 548 | Completed | New |
| 6440064-PH | 10/20/2015 | 11/19/2018 | Construction of multi-family and retail building with below grade parking and occupy per plan. | 461 | Completed | New |
| 6701662-PH | 6/6/2019 | 11/13/2025 | Phased project: Construct high rise apartment building with offices retail and below grade parking occupy per plan. Mechanical Included. | 459 | Completed | New |
| 6509023-PH | 9/7/2016 | 6/2/2022 | Phased project: Construct a new apartment building with ground floor commercial spaces and below grade parking occupy per plan. Mechanical included. | 457 | Completed | New |
| 6805890-DM | 2/16/2021 | 9/18/2023 | Demolish existing commercial building per plan. | 450 | Completed | Demolition |
| 6805872-PH | 3/2/2021 | 10/8/2025 | Phased project: Construct mixed-use residential building with below-grade parking occupy per plan. Existing landmarked structure at 1130 Rainier Ave S to remain. | 450 | Completed | New |
| 6425811-CN | 6/23/2015 | 4/16/2019 | Establish use as multi-family residential and general retail. Construct high-rise apartment and retail building and occupy per plan. | 450 | Completed | New |
| 6470875-PH | 7/21/2015 | 3/1/2019 | Construction of a residential and retail structure with two towers on a common base with below grade parking and occupy per plan. | 433 | Completed | New |
| 6608500-CN | 10/10/2018 | 3/29/2022 | Construct mixed use apartment building with ground level commercial and below grade parking occupy per plan. (Construct mixed use apartment building with ground level commercial and below grade parking. Includes shoring and excavation. Review/process 2 Record #'s under 6608500-CN.) | 432 | Expired | New |
| 6713157-PH | 6/28/2019 | 5/8/2024 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan (mechanical included) | 430 | Completed | New |
| 6542093-PH | 11/23/2016 | 12/9/2022 | Construct north residential tower occupy per plan. (Construct mixed-use building with two residential towers and below grade parking/review and process 2 Records under 6530812-PH. | 417 | Completed | New |
| 6284321-PH | 12/28/2014 | 12/8/2017 | Construct a new residential and office building with ground floor retail and below grade parking and occupy per plan. | 410 | Completed | New |
| 6808408-PH | 2/5/2021 | 11/6/2024 | Phased project: Construction of a residential building with below grade parking and occupy per plan. | 409 | Completed | New |
| 6679049-PH | 10/2/2018 | 10/27/2022 | Phased project: Construct a mixed-use high-rise building with below grade parking occupy per plan. Mechanical included. | 406 | Completed | New |
| 6722466-PH | 12/2/2019 | 12/21/2023 | Phased construction of two residential and retail towers with common below grade parking and occupy per plan | 402 | Completed | New |
| 6349605-PH | 12/18/2013 | 10/16/2017 | Construction of a residential and retail building with below and above grade parking and occupy per plan. | 398 | Completed | New |
| 6387467-PH | 9/18/2014 | 2/15/2018 | Construction of a residential high rise building with retail at grade and below grade parking and occupy per plan. | 396 | Completed | New |
| 6313065-PH | 4/11/2012 | 2/6/2015 | Phased project: Construction of a mixed use building and occupy residential portion per plans. | 386 | Completed | New |
| 6392841-PH | 11/20/2014 | 9/28/2017 | Construct a new residential and retail building with below grade parking and occupy per plan. | 385 | Completed | New |
| 6450010-PH | 2/1/2016 | 1/15/2019 | Construct a new residential and retail building with below grade parking and occupy per plan. | 384 | Completed | New |
| 6682794-PH | 9/27/2018 | 8/8/2022 | Phased project: Construct a residential tower above underground parking occupy per plan. (Religious institution building under separate permit 6688095-CN.) | 374 | Completed | New |
| 6792719-CN | 8/4/2020 | 2/2/2024 | Construct new mixed-use high rise building with attached parking occupy per plan. Revesting from6673354-CN | 365 | Completed | New |
| 6367752-PH | 12/12/2013 | 5/26/2016 | Construction of a residential and retail building with below grade parking and occupy per plans. | 361 | Completed | New |
| 6155458-PH | 11/18/2010 | 7/18/2017 | Construction of a mixed use building including soldier piles on adjacent properties and occupy residential portion per plan. | 357 | Completed | New |
| 6324793-PH | 11/2/2012 | 10/8/2015 | Phased permit: Construction of a residential and retail high-rise building including parking within the structure and occupy per plan. | 355 | Completed | New |
| 6806586-PH | 3/5/2021 | 4/30/2025 | Phased project: Construct multi-family building with below-grade parking occupy per plan. Mechanical included. | 345 | Completed | New |
| 6362107-PH | 12/28/2017 | 8/17/2021 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan (project includes mechanical). | 343 | Completed | New |
| 6780311-PH | 4/22/2020 | 1/29/2024 | Phased Project: Construct a residential / retail building with below-grade parking occupy per plan. | 338 | Completed | New |
| 6327387-PH | 11/13/2012 | 3/24/2015 | Phased project: Construct a residential and retail (highrise) building with below grade parking and occupy per plan. | 335 | Completed | New |
| 6678792-PH | 10/29/2018 | 7/19/2023 | Phased project: Construct mixed use apartment building with ground-level commercial and below-grade parking occupy per plan. (Yesler Terrace) | 335 | Completed | New |
| 6305752-PH | 3/14/2012 | 10/6/2014 | Phased Project: Construction of South tower for a residential retail and parking podium building and occupy per plan (Podium constructed under AP 6270796). | 331 | Completed | New |
| 6423027-PH | 9/3/2014 | 3/7/2019 | Construct a new residential apartment and hotel building with ground floor retail and below grade parking and occupy per plan. | 327 | Completed | New |
| 6504242-PH | 5/2/2016 | 2/20/2019 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan. | 325 | Completed | New |
| 6774635-CN | 1/29/2021 | 12/23/2024 | Construct tenant improvements for a grocery store in a mixed use building per plans. Mechanical included. | 325 | Completed | New |
| 6718826-PH | 8/16/2019 | 7/29/2025 | Phased project: Construct a mixed-use high rise with residential over lower floor commercial and below grade parking occupy per plan. Mechanical is included | 323 | Completed | New |
| 6626678-PH | 2/13/2018 | 6/10/2021 | Phased project: Construct mixed use residential building with ground floor commercial and underground parking occupy per plan. | 321 | Completed | New |
| 6139483-PH | 6/29/2011 | 6/4/2014 | Phased Project: Construction of a mixed use building and occupy per plan. | 319 | Completed | New |
| 6406611-PH | 7/31/2014 | 8/21/2017 | Construct a new residential and retail building with below and above grade parking and occupy per plan. | 314 | Completed | New |
| 6743483-PH | 7/26/2019 | 5/31/2022 | Phased permit: Construct mixed-use residential building with ground floor commercial and below grade parking occupy per plan. | 306 | Completed | New |
| 6313947-CN | 4/16/2012 | 12/10/2014 | Construction of mixed use residential and retail building with below grade parking and occupy per plan. | 304 | Completed | New |
| 6270553-PH | 9/24/2012 | 12/2/2015 | Phased project: Construction of a residential and commercial building with below grade parking and occupy per plan. Includes 17 live work for a total of 303 useable living spaces. | 303 | Completed | New |
| 6285721-PH | 4/23/2015 | 4/5/2018 | Phased Project: Construction of a mixed use residential tower with below grade parking and occupy per plan. | 303 | Completed | New |
| 6707863-DM | 12/4/2020 | 8/23/2021 | Demolish commercial building per plan. (All proposed work in the public right-of-way requires separate street use permits from SDOT) | 300 | Completed | Demolition |
| 6277475-PH | 6/19/2012 | 10/16/2014 | Phased project: Construction of residential and retail building with below grade parking and occupy per plan | 298 | Completed | New |
| 6436709-PH | 5/22/2015 | 4/10/2018 | Construction of a residential and retail building with below grade parking and occupy per plan. | 296 | Completed | New |
| 6741737-CN | 1/21/2021 | 12/17/2024 | Construct a multi-family building occupy per plans | 295 | Completed | New |
| 6389079-PH | 4/23/2014 | 1/10/2017 | Construction of a residential building with below grade parking and occupy per plan. | 294 | Completed | New |
| 6766925-PH | 4/23/2020 | 7/25/2023 | Phased project: Construction of a residential & live-work building (two towers) occupy per plan. | 294 | Completed | New |
| 6756502-PH | 3/31/2020 | 2/9/2024 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan. | 293 | Completed | New |
| 6741738-DM | 7/22/2021 | 9/8/2022 | Demolish commercial building per plans. Building permit issuance is required prior to the final inspection for this demolition permit; or all disturbed areas shall be fully stabilized and side sewers shall be capped. | 290 | Completed | Demolition |
| 6499720-PH | 1/23/2017 | 8/25/2021 | Phased project: Construction of three residential buildings with unified parking below grade and occupy per plan. | 289 | Completed | New |
| 6124374-PH | 5/26/2011 | 6/26/2014 | Phased project: Construction of a residential and retail building and occupy per plan. | 288 | Completed | New |
| 6549386-PH | 1/31/2017 | 10/19/2020 | Phased project: Construction of a residential building with below grade parking and occupy per plan | 288 | Completed | New |
| 6749889-CN | 10/20/2020 | 11/19/2024 | Construct a mixed-use building occupy per plans | 287 | Completed | New |
| 6282508-PH | 2/16/2012 | 4/28/2014 | Phased project: Construction of residential and retail building with parking provided in structure and occupy per plan. | 286 | Completed | New |
| 6587689-CN | 7/18/2017 | 2/27/2024 | Shoring and Excavation for construction of an apartment building with below grade parking per plan | 284 | Completed | Addition/Alteration |
| 6208152-CN | 2/8/2011 | 1/29/2013 | Construction of a mixed-use building and occupy per plan | 284 | Completed | New |
| 6750983-CN | 10/20/2020 | 12/17/2024 | Construct a mixed-use building occupy per plans. | 282 | Completed | New |
| 6306279-CN | 3/19/2013 | 3/30/2016 | Construction of a residential building with below grade parking and occupy per plan. | 282 | Completed | New |
| 6720158-DM | 6/17/2020 | 4/25/2024 | Demo existing commercial building (safeway) per plan | 280 | Completed | Demolition |
| 6380969-PH | 11/4/2013 | 11/2/2016 | Construction of a residential and commercial building with below grade parking and occupy per plan. | 278 | Completed | New |
| 6261037-CN | 10/15/2010 | 2/28/2013 | Establish use as and construct a mixed-use building and occupy per plan. | 275 | Expired | New |
| 6516677-PH | 6/3/2016 | 8/29/2019 | Phased Project: Construct a new apartment building with ground floor retail and below grade parking occupy per plan. | 275 | Completed | New |
| 6808365-DM | 2/4/2022 | 8/25/2025 | Demolition of existing commercial structure per plan | 273 | Completed | Demolition |
| 6319280-PH | 9/19/2017 | 5/30/2024 | Phased project: Construction of an apartment building with below grade parking and occupy per plan. Includes mechanical. | 271 | Completed | New |
| 6188438-CN | 8/18/2011 | 5/19/2017 | Construct North & South apartment building with underground parking and occupy per plan. | 269 | Completed | New |
| 6753118-PH | 3/13/2020 | 8/20/2024 | Phased project: Construction of an residential apartment and retail building with below grade parking and occupy per plan | 268 | Completed | New |
| 6178409-PH | 6/1/2011 | 4/24/2013 | Phased project: Construction of a mixed use building and occupy per plan (Mechanical included). | 266 | Completed | New |
| 6330884-PH | 9/10/2012 | 12/18/2014 | Phased permit: Construction of a mixed-use building with below grade parking and occupy per plan. | 266 | Completed | New |
| 6473856-PH | 10/6/2015 | 12/31/2020 | Phased project: Construct a new residential and retail building with above and below grade parking and occupy per plan. | 266 | Completed | New |
| 6444414-PH | 4/12/2016 | 9/13/2018 | Construction of a residential and retail building with below grade parking and occupy per plan. | 265 | Completed | New |
| 6725231-PH | 10/4/2018 | 9/7/2023 | Phased project: Construct mixed use building with two residential structures above common residential commercial and parking base and underground structure occupy per plan. Mechanical included. | 265 | Completed | New |
| 6753240-PH | 12/19/2019 | 9/10/2024 | Phased project: Construction of two residential towers over common below grade parking and occupy per plan | 261 | Completed | New |
| 6327328-PH | 10/10/2013 | 11/1/2018 | Construction of north residential and retail building with below grade parking and occupy per plan. . | 260 | Completed | New |
| 6388259-PH | 2/3/2014 | 8/1/2016 | Construct a residential building with below grade parking and occupy per plan. | 260 | Completed | New |
| 6783194-PH | 11/17/2020 | 9/27/2023 | Phased Project: Construct mixed-use residential/retail building with below-grade parking occupy per plan. | 260 | Completed | New |
| 6162556-CN | 12/23/2011 | 8/18/2014 | Construct 10 - story mixed use building with underground parking occupy per plans. | 258 | Completed | New |
| 6343709-PH | 3/4/2013 | 9/4/2018 | Construction of a residential and retail building with below grade parking and occupy per plans. | 256 | Completed | New |
| 6691097-CN | 10/10/2019 | 6/6/2022 | Construct mixed use building occupy per plan (Construct mixed use building and construct underpinning for mixed use building / review and process for 2 CN's under 6691097-CN) | 254 | Completed | New |
| 6336739-PH | 9/5/2013 | 3/3/2016 | Phased project: Construction of a residential and retail building with below grade parking and occupy per MUP 3014172 and per plans. | 249 | Completed | New |
| 6512963-PH | 10/5/2016 | 4/24/2019 | Phased project: Construct a new residential and commercial building with below grade parking and occupy per plan. | 249 | Completed | New |
| 6283644-PH | 8/31/2011 | 4/18/2014 | Phased project: Construction of a residential and retail building and occupy per plans. | 249 | Completed | New |
| 6307282-PH | 4/25/2013 | 7/7/2015 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan. | 248 | Expired | New |
| 6481063-PH | 10/30/2017 | 9/7/2022 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan | 243 | Completed | New |
| 6514618-PH | 2/19/2016 | 10/12/2020 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan | 243 | Completed | New |
| 6542269-PH | 12/30/2016 | 8/9/2019 | Phased permit: Construct mixed use building with apartments assisted living facility retail at ground level and below grade parking occupy per plan. | 243 | Completed | New |
| 6619977-PH | 3/18/2018 | 11/9/2021 | Phased project: Construct mixed use building with below grade parking occupy per plan. Mechanical included. | 239 | Completed | New |
| 6857761-PH | 11/23/2021 | 2/6/2025 | Phased project: Construction of a residential/retail building with below grade parking and occupy per plan | 238 | Completed | New |
| 6481846-PH | 12/1/2016 | 11/7/2019 | Phased project: Construct mixed use building with parking occupy per plan. | 237 | Completed | New |
| 6691423-PH | 6/7/2019 | 10/14/2022 | Phased project: Construct a residential building with below grade parking and grade level commercial and parking occupy per plan. Mechanical included. | 236 | Completed | New |
| 6777620-DM | 9/23/2021 | 8/25/2023 | Demolish existing structure per plan. | 236 | Completed | Demolition |
| 6280517-PH | 6/14/2011 | 3/19/2014 | Phased Project: Construction of a residential and restaurant building and occupy per plan. | 236 | Completed | New |
| 6314114-PH | 4/5/2016 | 3/11/2021 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan. | 235 | Completed | New |
| 6649428-CN | 3/12/2019 | 5/31/2024 | Construct new mixed use building with below grade parking occupy per plan. | 235 | Completed | New |
| 6781792-CN | 3/23/2023 | 12/1/2025 | Establish use as apartment per land use code. Construct new Mixed Use building occupy per plan. | 235 | Completed | New |
| 6182741-CN | 9/9/2010 | 10/22/2012 | Construct a 7-story / 3-basement mixed use building and occupy per plans. | 234 | Completed | New |
| 6766268-PH | 10/1/2020 | 8/22/2024 | Phased Project: Construct residential building with below-grade parking occupy per plan. | 227 | Completed | New |
| 6761025-PH | 1/29/2020 | 10/6/2022 | Phased project: Construction of a residential tower including mechanical and occupy per plan. | 226 | Completed | New |
| 6449319-PH | 11/10/2015 | 1/9/2019 | Construct a new residential building with below grade parking and occupy per plan. | 226 | Completed | New |
| 6781566-DM | 9/27/2019 | 6/9/2022 | Demolish a residential building per plan | 226 | Completed | - |
| 6781561-DM | 9/27/2019 | 6/9/2022 | Demolish a residential building per plan | 226 | Completed | Demolition |
| 6781564-DM | 9/27/2019 | 6/9/2022 | Demolish a residential building per plan | 226 | Completed | - |
| 6343703-PH | 5/30/2013 | 9/5/2018 | Construction of a residential and retail building with below grade parking and occupy per plan. | 221 | Completed | New |
| 6716040-PH | 5/6/2019 | 6/21/2023 | Phased project: Construct residential apartment building with below-grade parking occupy per plan. (Yesler Terrace) | 215 | Completed | New |
| 6771553-CN | 5/14/2020 | 12/20/2023 | Construct shoring and excavation for mixed use structure per plan. | 215 | Completed | New |
| 6771554-PH | 6/18/2020 | 9/25/2024 | Phased project: Construct a residential/retail/office building with below grade parking and occupy per plan. | 214 | Completed | New |
| 6825773-DM | 4/22/2021 | 8/12/2021 | Demolish commercial structure per plan | 214 | Completed | Demolition |
| 6767223-PH | 5/15/2020 | 5/22/2025 | Phased project: Construction of a residential and retail building and occupy per plan | 212 | Completed | New |
| 6301684-PH | 4/1/2013 | 10/16/2015 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan. | 212 | Completed | New |
| 6691462-PH | 9/5/2019 | 12/15/2023 | Phased project: Construct a multifamily high-rise building with retail and parking and occupy per plan. | 211 | Completed | New |
| 6320888-PH | 7/16/2013 | 3/29/2017 | Construction of a residential and retail building with existing character structures incorporated and below grade parking and occupy per plans. | 211 | Completed | New |
| 6352324-PH | 2/6/2014 | 9/20/2016 | Construction of a residential and retail building with below grade parking and occupy per plan. | 211 | Completed | New |
| 6743715-CN | 8/27/2019 | 5/18/2022 | Establish use as residential and retail and construct a mixed-use building with below grade parking occupy per plan. | 211 | Completed | New |
| 6313996-PH | 2/4/2013 | 5/31/2017 | Construction of a residential and retail building with below grade parking and occupy per plan. | 209 | Completed | New |
| 6451132-CN | 8/22/2016 | 1/28/2019 | Construct a mixed use residential and retail building with below grade parking per plan. | 209 | Completed | New |
| 6436184-PH | 12/21/2016 | 8/26/2021 | Phased project: Construction of an office/residential tower and an office tower on a common podium structure with below grade parking and occupy per plan. | 208 | Completed | New |
| 6775971-CN | 10/12/2020 | 11/6/2023 | Establish use as and construct mixed-use structure occupy per plan | 208 | Completed | New |
| 6252234-CN | 10/4/2010 | 1/22/2013 | Construct 16-story mixed-use high-rise building and occupy per plan. | 208 | Completed | New |
| 6775972-DM | 2/5/2021 | 1/12/2022 | Demolish existing commercial building per plans. | 208 | Completed | Demolition |
| 6770795-PH | 5/1/2020 | 7/17/2024 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan | 207 | Completed | New |
| 6427663-PH | 12/2/2014 | 6/21/2018 | Construction of a residential tower (first tower) with retail (common base structure) and below grade parking and occupy per plan. | 206 | Completed | New |
| 6427651-CN | 2/27/2015 | 6/21/2018 | Construction of a residential tower (second tower) on common base structure permitted under 6427663 (Routing with 6438662 - completion phase of 6427663). | 206 | Completed | New |
| 6743371-CN | 12/24/2020 | 12/27/2024 | Establish use as multi-family restaurant and office building construct mixed-use building and occupy per plans. | 206 | Completed | New |
| 6768936-PH | 8/3/2020 | 5/31/2024 | Phased project: Construction of residential and retail building with 3 towers over a common podium with retail and below grade parking and occupy per plan | 206 | Completed | New |
| 6769643-DM | 9/12/2017 | 11/2/2021 | Demolish existing commercial building per plan. | 205 | Completed | Demolition |
| 6728971-PH | 12/12/2018 | 3/3/2022 | Phased project: Construct a mixed use apartment building with below-grade parking occupy per plan. | 203 | Completed | New |
| 6685149-PH | 9/11/2018 | 1/3/2022 | Phased project: Construction of residential and retail building and occupy per plan. Mechanical included. | 203 | Completed | New |
| 6516430-PH | 7/13/2016 | 5/15/2019 | Phased project: Construct a new apartment building with ground floor retail and below grade parking occupy per plan. | 201 | Completed | New |
| 6811445-PH | 1/21/2021 | 5/21/2025 | Phased project: Construction of a residential building with below grade parking and occupy per plan. Mechanical is included. | 200 | Completed | New |
| 6770797-DM | 9/14/2020 | 11/2/2021 | Demolish existing structures per plan. | 200 | Completed | Demolition |
| 6371235-PH | 9/18/2013 | 10/5/2015 | Phased Permit: Construction of a residential and retail building with below grade parking and occupy per plan | 197 | Completed | New |
| 6481834-PH | 11/24/2015 | 6/6/2018 | Construct a new mixed-use building (1 live-work) with below grade parking and occupy per plan. | 195 | Completed | New |
| 6535937-CN | 8/16/2016 | 11/2/2020 | Establish use as and construct new multifamily structure with underground parking including street improvements and grading and occupy per plan. | 194 | Completed | New |
| 6815778-PH | 3/12/2021 | 8/18/2025 | Phased project: Construction of a residential/retail building with below grade parking and occupy per plan. | 194 | Completed | New |
| 6306072-CN | 1/29/2013 | 9/29/2015 | Establish use as multifamily residential and retail and construct new mixed-use building occupy per plan. | 193 | Completed | New |
| 6275256-PH | 11/2/2011 | 11/21/2013 | Phased project: Construction of west residential and retail building with below grade parking and occupy per plan (Construct two mixed use buildings and occupy per plan / process 2 AP's under #6275256). | 190 | Completed | New |
| 6292870-PH | 9/13/2011 | 10/8/2013 | Phased project: Construction of residential and retail building and occupy per plan. | 188 | Completed | New |
| 6634546-CN | 12/11/2017 | 2/4/2021 | Construct Building B (east tower) occupy per plans. (Construct a 2-tower mixed-use building over common parking structure occupy per plans. Mechanical included this permit. 2 Records reviewed under 6580293-CN) | 186 | Completed | New |
| 6635096-CN | 9/24/2018 | 8/23/2022 | Construct a mixed use building occupy per plans. | 186 | Completed | New |
| 6270796-PH | 4/22/2011 | 10/6/2014 | Phased Project: Construction of a residential retail and parking podium building including west tower and occupy per plan. | 181 | Completed | New |
| 6753326-PH | 3/3/2020 | 8/20/2024 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan | 180 | Completed | New |
| 6297169-CN | 12/29/2011 | 12/2/2013 | Construct new 7-story multifamily structure with below grade parking and occupy per plans. | 178 | Completed | New |
| 6468986-PH | 7/2/2015 | 10/12/2018 | Construction of a residential and retail building with below grade parking and occupy per plan. | 176 | Completed | New |
| 6679868-CN | 10/8/2018 | 12/7/2021 | Construct mixed use building and occupy per plan. | 176 | Completed | New |
| 6279647-CN | 4/23/2012 | 12/31/2014 | Construct apartment and retail building and occupy per plans. | 175 | Completed | New |
| 6314268-CN | 10/7/2013 | 6/15/2016 | Establish use as residential apartments and retail and construct mixed use building over below grade parking occupy per plan. | 174 | Completed | New |
| 6330059-PH | 10/16/2012 | 11/13/2014 | Phased permit: Construction of a residential and live-work building with below grade parking and occupy per plan. | 171 | Completed | New |
| 6772962-PH | 6/16/2020 | 1/5/2023 | Phased Project: Construct multi-family building (student apartments) occupy per plan. | 171 | Completed | New |
| 6706686-PH | 5/10/2019 | 7/13/2022 | Phased project: Construct mixed use apartment building with below grade parking occupy per plan. | 171 | Completed | New |
| 6787584-DM | 4/20/2022 | 12/16/2024 | Demo existing SW commercial building per plan. | 170 | Completed | Demolition |
| 6761362-PH | 5/15/2020 | 11/20/2025 | Phased Project: Construct a residential and retail building with at grade parking and occupy per plan | 170 | Completed | New |
| 6319158-CN | 4/7/2015 | 9/1/2017 | Construct new multi-family structure with underground parking and occupy per plan. | 170 | Completed | New |
| 6895307-DM | 4/20/2022 | 5/31/2024 | Demo existing residential building per plan. | 170 | Completed | Demolition |
| 6270913-CN | 12/2/2011 | 11/22/2013 | Construct new residential live-work and retail building with below grade parking and occupy per plan. | 170 | Completed | New |
| 6787582-CN | 1/27/2021 | 12/12/2025 | Establish use as and construct mixed-use building occupy per plan | 170 | Completed | New |
| 6517022-CN | 5/9/2016 | 6/8/2018 | Construct mixed-use structure and occupy per plan. | 170 | Completed | New |
| 6802005-CN | 4/15/2022 | 11/12/2025 | Establish use as multi-family and construct apartment building occupy per plan. | 169 | Completed | New |
| 6398637-PH | 4/3/2014 | 10/12/2016 | Construct a residential and (1) live-work building with below grade parking and occupy per plan. | 169 | Completed | New |
| 6342717-CN | 6/30/2014 | 3/8/2017 | Remove existing surface parking lot and construct mixed use building with below grade parking and occupy per plan. | 169 | Completed | New |
| 6731112-CN | 2/17/2021 | 8/22/2024 | Construct new multifamily building occupy per plan. | 168 | Completed | New |
| 6799799-PH | 12/10/2020 | 8/8/2025 | Phased Project: Construct multi-family residential building occupy per plan. | 168 | Completed | New |
| 6730809-CN | 12/5/2019 | 3/25/2024 | Establish use as and construct new multifamily structure (west building) and occupy per plan.(Construct 2 multifamily and processing of 2 records under 6730809-CN).Mechanical included for both. | 167 | Completed | New |
| 6770649-PH | 5/12/2020 | 4/1/2025 | Phased project: Construction of a residential/retail building with below grade parking and occupy per plan. | 167 | Completed | New |
| 6441816-PH | 6/30/2015 | 4/25/2018 | Construction of an apartment building with below grade parking and occupy per plan. | 166 | Completed | New |
| 6532180-PH | 6/14/2016 | 7/12/2019 | Phased project: Construction of a residential building including apartment and live/work units with below grade parking and occupy per plan. | 164 | Completed | New |
| 6533351-CN | 7/12/2016 | 1/22/2020 | Construct mixed use building including mechanical systems and below grade parking and occupy per plan. | 164 | Completed | New |
| 6326118-CN | 9/6/2012 | 7/21/2014 | Construction of apartment building & associated below grade parking & occupy per plan. | 162 | Completed | New |
| 6285569-PH | 4/12/2012 | 9/22/2014 | Phased permit: Construction of a residential and retail building with below grade parking and occupy per plan. | 161 | Completed | New |
| 6362512-PH | 8/18/2016 | 1/16/2019 | Construction of a residential and retail building with below grade parking and occupy per plan. | 160 | Completed | New |
| 6785362-PH | 10/1/2020 | 12/22/2023 | Phased project: Construction of a residential building with below grade parking and occupy per plan. Mechanical is included. | 160 | Completed | New |
| 6603306-CN | 11/2/2020 | 3/17/2025 | Construct multi-family building occupy per plan (Construct multifamily building and concrete landing review and process for 2 CN's under 6603306-CN) | 160 | Completed | New |
| 6191419-PH | 9/25/2013 | 9/26/2016 | Construction of a residential (151 dwelling units) and live work (8 LW units) building with below grade parking and occupy per plan. | 159 | Completed | New |
| 6401146-PH | 7/22/2014 | 8/24/2017 | Construction of a residential structure with below grade parking and occupy per plan.(6401146 and 6392906 submitted as one application - normal processing under each individual AP review approvals under each phase of each AP). | 159 | Completed | New |
| 6753857-CN | 12/23/2020 | 10/3/2024 | Construct new mixed use apartment building occupy per plan. Mechanical Included. | 158 | Completed | New |
| 6392906-PH | 7/22/2014 | 8/24/2017 | Construction of a residential structure and occupy per plan. | 158 | Completed | New |
| 6426745-PH | 8/12/2014 | 10/24/2017 | Construct a new residential apartment building with ground floor retail and below grade parking and occupy per plan. | 157 | Completed | New |
| 6779887-PH | 7/7/2020 | 11/26/2024 | Phased project: Construction of a residential/retail building with below grade parking and occupy per plan. | 157 | Completed | New |
| 6721992-CN | 6/23/2020 | 12/19/2023 | Construct a SHA mixed-use building occupy per plans. | 156 | Completed | New |
| 6494734-PH | 12/1/2015 | 7/6/2018 | Construction of two residential buildings over common below grade parking and occupy per plan. | 155 | Completed | New |
| 6155610-CN | 11/30/2010 | 9/10/2012 | Phase III of III to establish use as multifamily structure retail restaurant live/work structural and architectural completion of mixed use building and occupy per plan. | 154 | Completed | New |
| 6795011-CN | 8/19/2020 | 2/16/2023 | Establish use as and construct a mixed-use building occupy per plans. Mechanical included this permit(Create and link 2 demo permits for the buildings on 2 of the 3 properties). Revest of 6544278-CN | 153 | Completed | New |
| 6456440-PH | 2/4/2015 | 8/18/2017 | Construction of a residential and retail building (9 live-work) with below grade parking and occupy per plan. | 153 | Completed | New |
| 6352823-PH | 12/12/2013 | 12/1/2015 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan. Includes 16 live work spaces. | 151 | Completed | New |
| 6388507-CN | 12/12/2013 | 12/29/2015 | Establish use as apartments and retail sales and service and Construct new mixed use building with below-grade parking/Occupy per plan (Shoring and Excavation under 6389877). | 150 | Completed | New |
| 6415108-PH | 11/24/2015 | 7/31/2018 | Construct a new residential and retail building with below grade parking and occupy per plan. | 150 | Completed | New |
| 6602629-PH | 8/30/2017 | 6/4/2021 | Phased project: Construct mixed use building with underground parking occupy per plan. | 150 | Completed | New |
| 6466033-CN | 11/23/2016 | 9/13/2019 | Establish use as low income residential and construct substantial alterations to existing building 9 at Magnuson Park occupy per plan. | 148 | Completed | New |
| 6286283-CN | 8/11/2011 | 8/30/2013 | Construct multifamily residential building with underground parking and accessory amenity spaces on first floor and occupy per plan. | 145 | Completed | New |
| 6442978-PH | 2/26/2016 | 10/12/2018 | Construct a new residential and retail building with below grade parking and occupy per plan. | 144 | Completed | New |
| 6459639-CN | 7/21/2015 | 6/28/2018 | Establish use for apartment and live/work building (10 live-works). Construct apartment and live-work structure with basement garage and occupy per plan. | 143 | Completed | New |
| 6733065-PH | 1/10/2020 | 4/20/2023 | Phased project: Construction of a residential and retail building with below grade parking per plan | 143 | Completed | New |
| 6651705-CN | 8/9/2018 | 7/30/2021 | Construct a multi-use building occupy per plans. Mechanical included this permit. | 141 | Completed | New |
| 6602569-PH | 7/31/2018 | 11/9/2021 | Phased project: Construct mixed use building with below grade parking occupy per plan. Mechanical included. | 139 | Completed | New |
| 6654424-CN | 7/31/2018 | 12/13/2023 | Construct new apartment building with below-grade parking occupy per plan (shoring and excavation under 6684263-CN). | 139 | Completed | New |
| 6572059-PH | 2/16/2017 | 6/11/2019 | Phased project: Construct an apartment building with live-work units and parking occupy per plan. Mechancial included. | 138 | Completed | New |
| 6463254-PH | 12/30/2015 | 5/18/2020 | Phased project: Construct a new residential and retail building with below grade parking and occupy per plan. Review and processing for 2 A/P's under 6463254. | 138 | Completed | New |
| 6339323-PH | 8/21/2013 | 6/26/2015 | Phased project: Construction of a multifamily structure with below grade parking and occupy per plans. | 137 | Completed | New |
| 6557274-PH | 4/29/2019 | 1/25/2024 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan | 136 | Completed | New |
| 6321396-PH | 6/18/2012 | 11/18/2015 | Phased project: Construction of East mixed use building with underground parking and occupy per plan (Construction of two mixed use buildings with underground parking - 2 APs under 6321396) Separate SDOT permit also required. | 136 | Completed | New |
| 6287432-PH | 3/7/2012 | 9/11/2014 | Phased Project: Construction of a residential and retail building with below grade parking and occupy per plan. | 136 | Completed | New |
| 6336323-CN | 7/10/2014 | 9/26/2016 | Construct multi-use residential apartment building 2-live work with below grade parking and occupy per plan. | 136 | Completed | New |
| 6798165-CN | 9/4/2020 | 9/19/2022 | Establish use as low-income housing and construct an apartment building occupy per plan. | 136 | Completed | New |
| 6883525-DM | 12/20/2023 | 11/13/2024 | Demo commercial building per plan | 136 | Completed | Demolition |
| 6804677-CN | 10/20/2020 | 3/15/2024 | Construct west mixed use building A with below grade parking occupy per plan. (Construct mixed use building and residential building. Review and processing for 2 records under # 6804677-CN.) Revest of permit 6726468-CN. | 136 | Completed | New |
| 6377592-PH | 6/11/2014 | 9/22/2016 | Construct a new residential and retail building with below grade parking and occupy per plan. | 135 | Completed | New |
| 6557651-CN | 12/19/2016 | 6/18/2019 | Construct mixed use building with below grade parking and occupy per plan. | 135 | Completed | New |
| 6343532-PH | 2/19/2013 | 1/29/2016 | Phased project: Construction of north tower and entire below grade structure for residential and retail building with below grade parking and occupy per plan (Construct two residential and retail towers over common below grade parking garage and occupy per plan - 2APs under 6343532). | 134 | Completed | New |
| 6469609-CN | 6/18/2015 | 5/7/2019 | Construct mixed-use building with below grade parking & occupy per plans. | 134 | Completed | New |
| 6511955-CN | 3/31/2016 | 8/22/2018 | Construct new mixed use structure and occupy per plan. | 133 | Completed | New |
| 6284231-PH | 1/11/2012 | 10/22/2013 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan (Mechanical included). | 132 | Completed | New |
| 6420528-PH | 3/4/2015 | 7/18/2017 | Construction of a residential and 14-live-work building with below grade parking and occupy per plan. | 132 | Expired | New |
| 6505691-PH | 6/29/2016 | 6/27/2019 | Construct residential building with ground level retail and below grade parking occupy per plan. | 132 | Completed | New |
| 6301745-CN | 1/4/2012 | 5/27/2014 | Establish use and construct mixed use building with underground parking. and occupy per plan. There are only (2) live/work units in this development. | 131 | Completed | New |
| 6789626-CN | 4/15/2022 | 6/11/2025 | Establish use as mixed-use and construct apartment and commercial building occupy per plan. | 131 | Completed | New |
| 6453677-CN | 4/2/2015 | 7/10/2017 | Establish use as retail and multi-family residential. Construct mixed use retail multi-family residential building and occupy per plans. | 131 | Completed | New |
| 6308479-PH | 4/2/2012 | 2/5/2014 | Phased project: Construction of residential building and occupy per plan. | 131 | Completed | New |
| 6410710-CN | 6/16/2015 | 8/31/2017 | Construct mixed use building with below grade parking per plan. | 130 | Completed | New |
| 6365657-PH | 10/10/2013 | 11/1/2018 | Construction of south residential and retail building with below grade parking and occupy per plan (Double tagged with 6365657). | 129 | Completed | New |
| 6418212-PH | 5/22/2014 | 6/30/2016 | Construction of an assisted living facility (Aegis Living) with below grade parking and occupy per plan. | 129 | Completed | New |
| 6717481-CN | 6/18/2020 | 3/18/2024 | Construct multi-family building occupy per plan. Existing institutional building [KNIGHTS OF COLUMBUS] on same lot to remain. | 129 | Completed | New |
| 6462238-PH | 1/26/2016 | 3/15/2019 | Construct a new residential building with ground floor restaurant and below grade parking and occupy per plan. | 129 | Completed | New |
| 6528046-CN | 9/22/2016 | 5/22/2019 | Establish use and construct a multifamily building with below grade parking occupy per plan (Shoring and Excavation under No. 6531885). (Mechanical included) | 128 | Completed | New |
| 6510989-CN | 9/30/2016 | 8/29/2018 | Construct mixed use building with below grade parking for Seattle University student housing and occupy per plan. | 127 | Completed | New |
| 6733874-CN | 11/17/2020 | 12/23/2024 | Construct a mixed-use building occupy per plans | 126 | Completed | New |
| 6693711-CN | 2/7/2019 | 5/1/2023 | Establish use as mixed use of retail restaurant and apartments construct low income apartment and assembly building and occupy per plans. | 126 | Completed | New |
| 6760310-CN | 7/16/2020 | 2/14/2024 | Construct a mixed-use residential building occupy per plan. Mechanical is included. | 126 | Completed | New |
| 6801777-DM | 2/17/2021 | 9/8/2022 | Demolish existing commercial building per plan | 125 | Completed | - |
| 6686496-CN | 10/23/2018 | 5/14/2025 | Establish use as residential and retail and construct a mixed-use structure with below grade parking occupy per plan. | 125 | Completed | New |
| 6746799-CN | 1/20/2021 | 6/27/2025 | Construct new residential and commercial building occupy per plan. | 125 | Completed | New |
| 6373193-CN | 12/19/2013 | 9/12/2016 | Substantial alteration to Publix Hotel. Removal of Uwajimaya Warehouse to 1st floor level and construction of 6-story mixed-use building to combine structures into one building as a single project all per plan (commercial tenant improvements by separate permit). | 125 | Completed | Addition/Alteration |
| 6796666-CN | 10/23/2020 | 3/19/2024 | Construct an apartment building and occupy per plan. Mechanical Included. | 124 | Completed | New |
| 6255925-CN | 3/23/2011 | 9/20/2012 | Establish use as multifamily structure and construct apartment building with basement parking and occupy per plan. | 124 | Completed | New |
| 6456371-CN | 3/11/2015 | 4/24/2017 | Construct new residential and retail building with below grade parking and occupy per plan. | 124 | Completed | New |
| 6343551-PH | 2/19/2013 | 1/29/2016 | Phased project: Construction of south tower for residential and retail building and occupy per plan (Construct two residential and retail towers over common below grade parking garage and occupy per plan - see also 6343532) | 123 | Completed | New |
| 6268969-CN | 3/9/2012 | 12/18/2014 | Construct New 5 Story Mixed-Use residential Building with ground floor parking occupy per plan. | 123 | Completed | New |
| 6213719-PH | 6/15/2011 | 10/1/2012 | Phased project: Construction of a residential and retail building and occupy per plan | 121 | Completed | New |
| 6797778-CN | 11/23/2020 | 6/12/2024 | Establish use as apartment and construct a residential building occupy per plan. | 120 | Completed | New |
| 6364158-CN | 6/11/2013 | 7/7/2015 | Establish use as residential and commercial retail with accessory parking. Construct mixed use building and occupy per plan. | 120 | Completed | New |
| 6375339-PH | 1/14/2014 | 1/6/2017 | Establish use as residential apartments and general sales and service. Construct a residential and retail building with below grade parking and occupy per plan. | 120 | Completed | New |
| 6363305-CN | 6/18/2013 | 5/27/2015 | Construction multistory apartment building with basement parking and roof deck with retail space and parking for 47 vehicles under cover and occupy per plans. | 120 | Completed | New |
| 6802004-DM | 2/24/2021 | 12/7/2023 | Demolish existing commercial building per plan. | 120 | Completed | Demolition |
| 6221985-PH | 2/13/2012 | 7/1/2013 | Phased permit: Construction of a residential and retail building with below grade parking and occupy per plan. | 120 | Completed | New |
| 6735666-DM | 6/17/2020 | 7/23/2021 | Demo existing commercial building per plan. | 120 | Completed | Demolition |
| 6478379-PH | 12/9/2016 | 10/11/2019 | Construct multifamily residential building with parking and ground floor offices occupy per plan. | 119 | Completed | New |
| 6828627-CN | 8/18/2021 | 8/22/2023 | Establish use as mercantile and multifamily construct mixed use building and occupy per plan. | 119 | Completed | New |
| 6771794-CN | 11/16/2020 | 12/1/2023 | Construct new mixed-use building (LGBTQ Senior Housing) occupy per plan. Mechanical is included. | 118 | Completed | New |
| 6745985-PH | 12/3/2019 | 5/5/2022 | Phased permit: Construct residential mixed use building with ground floor commercial and partially below-grade parking occupy per plan. | 118 | Completed | Addition/Alteration |
| 6526320-PH | 6/6/2016 | 3/7/2019 | Construction of a residential building with below grade parking and occupy per plan. | 118 | Completed | New |
| 6321320-CN | 4/8/2013 | 7/29/2015 | Establish use as multifamily structure construct apartment building with below grade parking garage and occupy per plan (shoring and excavation under 6351658) | 118 | Completed | New |
| 6185436-CN | 6/22/2010 | 1/29/2013 | Construct new mixed use residential building and occupy per plan. | 118 | Completed | New |
| 6287638-CN | 2/29/2012 | 10/10/2014 | Construction of a new apartment and live work building over underground parking and occupy per plan. | 117 | Approved to Occupy | New |
| 6382268-CN | 11/19/2013 | 2/19/2016 | New construction of a 6-story mixed-use building containing; 117 residential units and (2) levels of below grade parking per MUP 3016404 and per plans. | 117 | Completed | New |
| 6120864-CN | 1/12/2012 | 5/6/2014 | Phase III of III (Architectural and structural completion of East building including common below grade parking for all three buildings). Construction of three mixed use buildings with below grade parking and occupy per plan (3 A/Ps under 6120864). | 116 | Completed | New |
| 6427812-CN | 12/16/2016 | 3/11/2019 | Construct mixed-use building and occupy per plan. | 115 | Completed | New |
| 6726311-CN | 9/9/2020 | 11/26/2024 | Construct apartment building with below grade parking occupy per plan. | 114 | Completed | New |
| 6279458-CN | 8/9/2011 | 5/12/2014 | Construct West apartment building and occupy per plan. | 114 | Completed | New |
| 6737545-CN | 11/5/2020 | 12/24/2024 | Construct an apartment building with below grade parking occupy per plan. | 114 | Completed | New |
| 6270926-CN | 12/2/2011 | 11/7/2014 | Construct new residential 4 live-work units and retail building with below grade parking and occupy per plan. | 113 | Completed | New |
| 6592620-PH | 6/10/2018 | 9/9/2021 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan | 113 | Completed | New |
| 6722382-PH | 5/6/2019 | 7/16/2025 | Phased project: Construction of a residential and retail building with below grade areas for storage and mechanical systems and occupy per plan | 112 | Completed | New |
| 6278495-CN | 9/11/2012 | 6/11/2014 | Establish use & construct a six-story 93 743 sq. ft. structure containing 4-live work units and 108 multifamily apartment units. Parking for 70 vehicles to be provided below grade (MUP 3012241) Shoring & Excavation under permit #6330218 & occupy per plan. | 112 | Completed | New |
| 6304750-PH | 1/24/2012 | 10/15/2014 | Phased Project: Construction of a multifamily building and occupy per plan. | 111 | Completed | New |
| 6423757-CN | 4/4/2015 | 8/15/2017 | Construct multi-family building (SHA Yesler Terrace) with below grade parking occupy per plan. | 111 | Completed | New |
| 6281378-CN | 6/1/2012 | 9/24/2015 | Excavation shoring and construction of new mixed used building with underground parking and occupy per plan. | 111 | Completed | New |
| 6441741-PH | 6/30/2015 | 4/25/2018 | Construction of an apartment building with below grade parking and occupy per plan. | 110 | Completed | New |
| 6576659-PH | 3/7/2017 | 9/19/2019 | Phased project: Construct mixed use building with apartments and ground floor retail and below grade parking occupy per plan. | 110 | Completed | New |
| 6603204-PH | 10/2/2017 | 3/2/2020 | Phased project: Construct mixed use building with underground parking occupy per plan. | 110 | Completed | New |
| 6915553-CN | 6/21/2023 | 10/2/2025 | Establish use as supportive housing & construct apartment structure occupy per plan | 109 | Completed | New |
| 6704336-CN | 6/29/2020 | 5/15/2025 | Construct West SE townhouse (bldg 5) per plan.[Establish use as and construct 5 new townhouse structures per plan. Review & process for 5 records under permit # 6704336-CN]. | 109 | Completed | New |
| 6461431-CN | 6/4/2015 | 4/18/2017 | Establish use as and construct a mixed-use commercial building (including low-income housing) and occupy per plans. | 108 | Completed | New |
| 6292782-CN | 7/26/2012 | 9/3/2014 | Construct new mixed use building with below grade parking and occupy per plans. | 108 | Completed | New |
| 6558317-CN | 12/19/2016 | 11/18/2019 | Construct new mixed use building with parking below per plan (shoring and excavation under No. 6567217). | 108 | Completed | New |
| 6405423-CN | 11/2/2015 | 1/9/2018 | Construct multifamily building occupy per plan. | 107 | Expired | New |
| 6331683-CN | 7/2/2015 | 3/29/2018 | Construct addition and substantial alterations to existing structure to include mixed-use and parking within structure and occupy per plan. | 107 | Completed | Addition/Alteration |
| 6595306-PH | 10/20/2017 | 3/25/2020 | Phased project: Construct mixed use building with apartments ground floor retail and below grade parking occupy per plan. | 107 | Completed | New |
| 6309478-CN | 9/6/2016 | 3/13/2020 | Land Use Application to allow 1 illuminated wall sign and 3 banner signs on a multifamily structure. | 107 | Completed | New |
| 6534447-PH | 10/20/2016 | 4/10/2019 | Construction of a residential and retail building with below grade parking and occupy per plan. | 107 | Completed | New |
| 6742903-CN | 7/14/2020 | 5/24/2024 | Construct residential building occupy per plan. | 107 | Completed | New |
| 6167489-PH | 5/8/2012 | 12/29/2014 | Phased permit: Construction of a mixed use building with below grade parking and occupy per plan. | 106 | Completed | New |
| 6411450-CN | 9/4/2014 | 5/22/2017 | Construct multi-family apartment and (4) live/work building with lower level parking garage and occupy per plans. | 106 | Completed | New |
| 6165135-CN | 1/24/2013 | 10/4/2017 | Construct new residential (senior housing) building with (2) live work units at ground level and below grade parking and occupy per plan. | 106 | Completed | New |
| 6303311-CN | 9/20/2012 | 12/19/2014 | Construct mixed use multi-family and live/work building and occupy per plans. | 106 | Completed | New |
| 6337899-CN | 12/18/2013 | 9/8/2016 | Establish use as apartments and retail and construct new mixed use building and occupy per plan. | 105 | Completed | New |
| 6181841-PH | 9/8/2010 | 5/16/2012 | Construction of a new mixed-use building (residental and retail) and occupy per plan (phase project). | 105 | Completed | New |
| 6604969-CN | 5/21/2018 | 4/26/2020 | Construct new mixed use building with below grade parking occupy per plan. | 105 | Completed | New |
| 6746477-DM | 1/19/2021 | 5/9/2025 | Demo existing commercial building per plan. | 104 | Completed | Demolition |
| 6723755-CN | 11/20/2019 | 9/17/2021 | Construct new mixed-use structure occupy per plan. Mechanical Included | 104 | Completed | New |
| 6808086-DM | 2/2/2021 | 5/9/2025 | Demolish office/warehouse building per plan. | 104 | Completed | Demolition |
| 6745978-CN | 10/22/2020 | 1/24/2024 | Establish use as and construct mixed-use structure occupy per plan | 104 | Completed | New |
| 6264285-CN | 3/30/2011 | 6/26/2014 | Establish use as multifamily structure and retail construct retail and apartment building with basement parking and occupy per plan.There are 104 units plus one live-work unit. | 104 | Completed | New |
| 6252917-CN | 10/15/2010 | 5/21/2017 | Establish use as apartments and live/work and construct apartments live/work and parking per plan. Project # 6319177 revision to change from pre-cast detention vault to cast-in-place detention vault. | 104 | Completed | New |
| 7080198-CN | 4/10/2025 | 9/2/2025 | Construct interior alterations to existing multi-family residence (unit A402) per STFI | 104 | Completed | Addition/Alteration |
| 6746800-DM | 1/19/2021 | 5/9/2025 | Demolish commercial structure per plan | 104 | Completed | Demolition |
| 6733027-PH | 2/21/2019 | 12/13/2024 | Phased project: Construct apartment building with below grade parking per plan | 103 | Completed | New |
| 6702837-DM | 5/28/2020 | 2/11/2021 | Demolish existing structure per plan. | 103 | Completed | Demolition |
| 6702836-CN | 4/8/2020 | 6/14/2022 | Construct mixed-use apartment building occupy per plan (Construct mixed use building and shoring/retaining wall on adjacent property review and process for 2 CN's under 6702836-CN) | 103 | Completed | New |
| 6153914-CN | 8/14/2012 | 11/20/2014 | Construct mixed use apartment and live-work building with below grade parking garage and occupy per plan. | 103 | Completed | New |
| 6299569-PH | 11/18/2011 | 12/17/2013 | Phased project: Construction of an assisted living residential and retail building with below grade parking and occupy per plan | 102 | Expired | New |
| 6735104-CN | 12/6/2019 | 4/12/2023 | Construct a mixed-use building occupy per plan. | 102 | Completed | New |
| 6306055-CN | 11/27/2012 | 2/23/2015 | Establish use and construct an apartment building and occupy per plans. | 102 | Completed | New |
| 6504660-PH | 2/1/2016 | 12/21/2018 | Construct a new residential office and restaurant building with below grade parking and occupy per plan. | 102 | Completed | New |
| 6736316-PH | 10/16/2019 | 7/5/2022 | Phased project: Construct apartment building with underground parking occupy per plan. | 102 | Completed | New |
| 6778287-CN | 12/1/2020 | 11/15/2024 | Construct mixed-use low-income apartment building occupy per plan. Mechanical included. (construct new mixed use building alterations to existing multifamily building D and alterations to existing parking structure review and process for 3 CN's under 6778287-CN) | 101 | Completed | New |
| 6737928-CN | 8/4/2020 | 7/23/2024 | Establish use as apartments and restaurant construct mixed-use building and occupy per plans. Mechanical included. | 101 | Completed | New |
| 6625230-CN | 12/14/2018 | 12/3/2021 | Construct new mixed-use building occupy per plan. | 100 | Completed | New |
| 6774893-DM | 4/8/2020 | 5/5/2021 | Demolish existing duplex per plan. | 100 | Completed | Demolition |
| 6586110-CN | 7/3/2017 | 5/14/2019 | Construct apartment building (SEDU) with attached parking occupy per plan. | 100 | Completed | New |
| 6354400-CN | 8/14/2014 | 1/23/2017 | Establish use as (4) live-work apartments and accessory parking and construct mixed use building with below grade parking occupy per plan. | 100 | Completed | New |
| 6735665-CN | 6/18/2020 | 7/18/2022 | Construct a new multi-family building occupy per plans | 100 | Completed | New |
| 6138161-CN | 5/6/2011 | 1/3/2013 | Establish use as multifamily residential and general retail sales and service and construct new mixed-use structure with parking and occupy per plan. | 100 | Completed | New |
| 6307992-CN | 1/12/2012 | 5/6/2014 | Phase III of III (Architectural and structural completion of SW building) for construction of three mixed use buildings with below grade parking and occupy per plan (3 A/Ps under 6120864). | 99 | Completed | New |
| 6407714-CN | 10/16/2014 | 7/26/2019 | Establish use as apartments. Construct apartment building and occupy per plans. | 99 | Completed | New |
| 6561170-PH | 12/30/2016 | 9/13/2019 | Phased project: Construct an apartment building with ground floor commercial and below grade parking occupy per plan. | 98 | Completed | New |
| 6631858-CN | 8/27/2018 | 7/7/2022 | Establish use as apartment and retail and construct a mixed-use building with attached parking occupy per plan. | 98 | Completed | New |
| 6289030-PH | 10/17/2011 | 4/18/2013 | Phased project: construction of a residential and retail building and occupy per plan. | 97 | Completed | New |
| 6164894-PH | 7/12/2013 | 4/27/2017 | Construction of a mixed use residential (apartments and hotel) and retail building with below grade parking and occupy per plans. | 97 | Completed | New |
| 6365990-CN | 1/7/2014 | 12/18/2015 | Establish use as and construct apartment building with reduced parking for low income disabled units and mechanical and occupy per plan. | 97 | Completed | New |
| 6736092-CN | 9/16/2019 | 6/22/2022 | Construct new mixed-use building occupy per plan. | 97 | Completed | New |
| 6324871-CN | 3/10/2013 | 2/17/2015 | Establish use as and construct a new multifamily residence and occupy per plan. | 96 | Completed | New |
| 6331518-CN | 10/9/2013 | 6/28/2016 | Establish use as residential apartments and child care center and construct new mixed use building occupy per plan. | 96 | Completed | New |
| 6604088-CN | 3/26/2018 | 1/31/2020 | Establish use as and construct new apartment building and occupy per plan. Mechanical included in this permit. | 95 | Completed | New |
| 6752870-CN | 12/21/2021 | 1/6/2026 | Construct low-income mixed-use apartment building occupy per plan. | 95 | Completed | New |
| 6615994-CN | 4/11/2018 | 9/23/2021 | Construct new mixed-use building with underground parking garage occupy per plan. Mechanical is included. Shoring and excavation work under No. 6634347-CN. | 95 | Completed | New |
| 6414739-PH | 5/6/2014 | 1/25/2017 | Construction of a residential and retail building with below grade parking and occupy per plan. | 95 | Completed | New |
| 6602639-PH | 8/31/2017 | 7/2/2021 | Phased project: Construct mixed use building with underground parking occupy per plan. | 94 | Completed | New |
| 6526803-CN | 4/5/2016 | 3/14/2018 | Construct mixed use building with below grade parking and occupy per plan. | 94 | Completed | New |
| 6303152-CN | 12/24/2012 | 7/16/2015 | Construct center multi-family residential structure and below-grade parking garage and occupy per plans. Construct 3 multi-family residential structures (reviews and processing for 3 A/Ps under 6303152). | 94 | Completed | New |
| 6490622-CN | 11/28/2016 | 3/30/2023 | Construct mixed-use retail/multi-family residential building and occupy per plans. | 94 | Completed | New |
| 6300774-CN | 8/16/2012 | 7/21/2015 | Construct multifamily building and occupy per plan. Establish use as multifamily residence and construct one 94-unit apartments three 3-unit townhouses with below grade parking (review & process for 4 AP's under #6300774). | 94 | Completed | New |
| 6686501-CN | 12/13/2018 | 8/5/2025 | Construct new mixed-use building (Roystone Apartments) occupy per plan. | 93 | Completed | New |
| 6705551-CN | 1/22/2020 | 10/27/2022 | Construct mixed-use apartment building occupy per plan. | 93 | Completed | New |
| 6712052-CN | 7/30/2019 | 6/15/2022 | Construct new mixed use building on vacant lot occupy per plan. Mechanical included. | 93 | Completed | New |
| 6197474-CN | 12/29/2010 | 3/29/2013 | Establish use and construct apartment/commercial mixed-use building with underground parking (mechanical included) and occupy per plan. | 93 | Completed | New |
| 6366219-CN | 7/31/2014 | 8/15/2016 | Construct mixed use residential assisted living structure with retail underground parking and commercial kitchen build-out (state jurisdiction) and occupy per plans. | 93 | Completed | New |
| 6604491-CN | 2/28/2020 | 1/16/2025 | Construct new multifamily building with ground floor commercial and occupy per plan. | 92 | Approved to Occupy | New |
| 6707386-CN | 6/7/2019 | 3/11/2022 | Construction additions and alterations to existing mixed use building and occupy per plan. | 92 | Completed | Addition/Alteration |
| 6352828-CN | 6/21/2013 | 2/23/2016 | Establish uses as multifamily residence and restaurant. Construct mixed use building with below grade parking and occupy per plan. | 92 | Completed | New |
| 6230544-CN | 11/19/2010 | 5/19/2017 | Establish use as and construct mixed use building including retail restaurant 3 live-work and apartments with below grade parking and occupy per plan. | 92 | Completed | New |
| 6405410-PH | 8/27/2014 | 7/26/2016 | Construction of residential building including (1) live-work unit and parking at grade and occupy per plan. | 91 | Expired | New |
| 6540988-CN | 7/15/2016 | 6/13/2017 | Construct alterations to assisted living facility and residential treatment facility and addition of exterior stairs per plan. | 91 | Completed | Addition/Alteration |
| 6636579-CN | 5/24/2018 | 9/30/2020 | Establish use as apartment and construct new multifamily building per plan. | 91 | Completed | New |
| 6526216-PH | 4/14/2016 | 2/28/2018 | Construct a new apartment building with 1st & 2nd floor offices and accessory detached garage occupy per plan. | 91 | Completed | New |
| 6727467-CN | 5/5/2020 | 11/17/2024 | Construct mixed-use boarding house and apartment building and occupy per plans. | 91 | Completed | New |
| 6490595-CN | 11/4/2015 | 10/8/2019 | Construct new 4-story mixed use building with below grade parking occupy per plan. | 91 | Completed | New |
| 6769997-CN | 7/1/2020 | 6/30/2023 | Construct a mixed-use building addition and substantial alterations to a community center occupy per plans | 90 | Completed | New |
| 6463834-CN | 8/31/2016 | 11/30/2018 | Establish use as multifamily residential and general sales & services and construct new mixed use building occupy per plan. | 90 | Completed | New |
| 6325848-CN | 9/5/2013 | 10/16/2015 | Establish uses as restaurant retail automotive and apartments with below grade parking. Construct mixed use building with underground garage and occupy per plan. | 90 | Completed | New |
| 6275578-PH | 11/2/2011 | 11/27/2013 | Construction of southeast residential retail and office building and occupy per plan (see also 6275256). | 90 | Completed | New |
| 6650993-CN | 7/12/2018 | 12/10/2020 | Construct new multifamily building per plan. Mechanical included. | 90 | Completed | New |
| 6562844-CN | 1/19/2017 | 7/24/2020 | Construct mixed use building with small efficiency dwelling units apartments live-work units and ground floor retail occupy per plan. | 90 | Completed | New |
| 6735916-CN | 7/7/2020 | 3/17/2025 | Construct multifamily building with ground level childcare facility occupy per plan. | 89 | Completed | New |
| 6783888-CN | 11/9/2021 | 10/30/2025 | Construct new apartment building occupy per plan. Mechanical is included. | 89 | Completed | New |
| 6368919-CN | 9/12/2013 | 1/10/2017 | Construction of a mixed use residential and (8) live-work development in two 4-story structures over common parking garage per plan. | 88 | Completed | New |
| 6347504-PH | 9/9/2013 | 12/15/2017 | Construction of a residential and retail building with below grade parking and occupy per plans. | 88 | Completed | New |
| 6305952-CN | 7/26/2012 | 10/15/2014 | Construct new mixed-use building containing residential office retail and theater space with parking below grade and occupy per plan. | 88 | Completed | New |
| 6736093-DM | 5/6/2020 | 6/21/2022 | Demo existing commercial building per plan. | 88 | Completed | Demolition |
| 6350629-CN | 1/13/2014 | 10/12/2016 | Establish use as multi-family residential general retail and office. Construct mixed-use building and occupy per plans. | 88 | Completed | New |
| 6314549-PH | 1/31/2013 | 6/2/2015 | Phased project: Construction of a residential and retail building with below grade parking and occupy per plan. | 88 | Completed | New |
| 6251579-CN | 6/21/2011 | 2/5/2013 | Construct mixed use apartment building with parking at ground level and occupy per plan. | 87 | Completed | New |
| 6854554-CN | 5/27/2022 | 1/8/2025 | Construct new mixed use building with residential childcare church and offices occupy per plan. | 87 | Completed | New |
| 6771332-CN | 2/12/2021 | 12/23/2024 | Establish use as apartments construct apartment building and occupy per plans. | 86 | Completed | New |
| 6795177-CN | 1/21/2021 | 5/13/2025 | Construct a Permanent Supportive Housing building occupy per plans. Mechanical included this permit. | 86 | Inspections Completed | New |
| 6617518-CN | 12/13/2018 | 10/15/2020 | Construct new mixed-use multifamily building (North building) occupy per plan. Shoring and excavation under separate permit. | 85 | Completed | New |
| 6538167-PH | 5/12/2017 | 12/6/2021 | Phased project: Construct mixed use apartment building (using modular construction for upper floors) occupy per plan. | 85 | Completed | New |
| 6602570-PH | 7/31/2018 | 5/19/2021 | Phased project: Construction of a residential retail and live-work building with below grade parking and occupy per plan | 85 | Completed | New |
| 6425246-CN | 10/14/2014 | 2/28/2017 | Construction of an 8 story 85 unit residential building with below grade parking for 13 vehicles and occupy per plan. | 85 | Completed | New |
| 6461843-CN | 9/10/2015 | 10/2/2017 | Establish use as residential structure. Construct new apartment and congregate living facility building. Construct substantial alterations to existing residential structure (changing function from duplex to spaces associated with new residential building) relocate on site and connect to new building; occupy per plans. | 84 | Completed | New |
| 6383259-CN | 8/19/2014 | 12/5/2016 | Construct two tower mixed use building and occupy per plan. | 84 | Completed | New |
| 6438403-CN | 9/14/2015 | 6/18/2019 | Change of use from hotel to apartments and construct substantial alterations and addition to existing mixed use building occupy per plan. | 84 | Completed | Addition/Alteration |
| 6857703-CN | 1/30/2023 | 10/20/2025 | Establish use as new multifamily apartment building per land use code (St. Luke's Affordable Housing Ballard) occupy per plan. | 84 | Completed | New |
| 6253686-CN | 7/29/2011 | 1/15/2013 | Construct new residential building and occupy per plan. | 84 | Completed | New |
| 7071241-CN | 3/13/2025 | 1/8/2026 | Construct tenant improvements to existing multifamily building occupy per plan. Mechanical included. | 84 | Completed | Addition/Alteration |
| 6469610-CN | 6/18/2015 | 9/10/2019 | Construct residential building with surface parking and occupy per plan. | 83 | Completed | New |
| 6371868-CN | 12/31/2014 | 2/17/2017 | Establish use as eating and drinking establishment and apartments and construct new mixed-use structure occupy per plan. | 83 | Completed | New |
| 6307991-CN | 1/12/2012 | 5/6/2014 | Phase III of III (Architectural and structural completion of North building) for construction of three mixed use buildings with below grade parking and occupy per plan (3 A/Ps under 6120864). | 83 | Completed | New |
| 6580293-CN | 12/11/2017 | 2/4/2021 | Construct parking structure and Building A (west tower) occupy per plans. (Construct a 2-tower mixed-use building over common parking structure occupy per plans. Mechanical included this permit. 2 Records reviewed under 6580293-CN). | 83 | Completed | New |
| 6357335-CN | 1/13/2014 | 12/22/2015 | Construction of a residential and retail building with below grade parking and occupy per plan. | 83 | Completed | New |
| 6458687-CN | 3/24/2015 | 3/8/2017 | Construction and Occupancy of residential and retail building with 76 residential units one retail space 6 live work spaces and below grade parking per plan. | 82 | Completed | New |
| 6494716-PH | 3/28/2016 | 4/9/2018 | Construct a new assisted living facility with below grade parking and occupy per plan. | 82 | Completed | New |
| 6752317-CN | 1/23/2020 | 6/1/2022 | Construct a multi-family building occupy per plans. Mechanical included this permit | 82 | Completed | New |
| 6538406-CN | 9/13/2016 | 3/5/2020 | Establish use as and construct a mixed use building (Rainier Court Apartment West Development) occupy per plans | 81 | Completed | New |
| 6790933-CN | 10/15/2020 | 1/12/2023 | Establish use as and construct a mixed-use building occupy per plans. | 81 | Completed | New |
| 6504348-CN | 1/21/2016 | 4/26/2018 | Construct new mixed-use building with apartments ground floor retail and ground floor parking garage occupy per plan. | 81 | Completed | New |
| 6676953-CN | 4/16/2019 | 10/28/2022 | Establish use as retail (art gallery) medical services human services (Chief Seattle Club) and apartments. Construct mixed-use residential and commercial building and occupy per plans. | 80 | Completed | New |
| 6379558-CN | 9/20/2013 | 9/8/2016 | Construct 78 unit apartment building and 2 additional live-work units over one level of below grade parking and occupy per plan. | 80 | Completed | New |
| 6850563-DM | 12/19/2023 | 1/31/2025 | Demo commercial building per plan | 80 | Completed | Demolition |
| 6507981-PH | 3/8/2016 | 4/24/2019 | Phased project: Construct a new residential apartment and (2) live-work building with below grade parking and occupy per plan. | 80 | Completed | New |
| 6792171-CN | 9/18/2020 | 9/20/2024 | Establish use as and construct mixed-use structure occupy per plan | 80 | Completed | New |
| 6471574-CN | 11/17/2015 | 10/2/2017 | Construct new office and residential apartment building occupy per plan. | 80 | Completed | New |
| 6158208-CN | 9/21/2010 | 3/19/2013 | Establish use for and construct a mixed use building consisting of low-income apartments over commerical/office tenant spaces enclosed parking a commercial kitchen with rooftop deck and green roof and occupy per plans. Related MUP #3010420. | 80 | Completed | New |
| 6590417-CN | 7/21/2017 | 4/10/2020 | Construct a mixed use building containing apartment live work commercial space and below grade parking occupy per plan. | 80 | Expired | New |
| 6459262-CN | 8/5/2015 | 9/28/2017 | Construct mixed use residential (4) live-work and commercial building with below grade parking and occupy per plan. | 79 | Completed | New |
| 6405584-PH | 5/26/2015 | 6/7/2017 | Construct a new residential and retail building with below grade parking and occupy per plan. | 79 | Completed | New |
| 6802527-CN | 10/29/2020 | 7/23/2024 | Establish use as and construct mixed-use apartment structure occupy per plan | 79 | Completed | New |
| 6722081-CN | 1/24/2020 | 10/18/2022 | Construct multi-family building with below-grade parking occupy per plan. | 79 | Completed | New |
| 6696273-CN | 2/19/2019 | 10/26/2022 | Construct multifamily residential apartment building and occupy per plan. | 79 | Completed | New |
| 6308275-CN | 2/7/2012 | 3/2/2015 | Establish use as and construct a new mixed-use building (retail/restaurant/live-work/apartments) with underground parking occupy per plan. Includes 2 Live work units. | 78 | Completed | New |
| 6830110-DM | 8/7/2024 | 12/24/2025 | Demolish commercial building and site improvements per plan. | 78 | Completed | Demolition |
| 6803853-DM | 7/1/2021 | 11/29/2021 | Demo commercial structure per plan | 78 | Completed | Demolition |
| 6771321-CN | 2/5/2021 | 8/9/2024 | Establish use as & construct mixed-use structure occupy per plan | 78 | Completed | New |
| 6717980-CN | 7/23/2019 | 9/13/2022 | Construct multi-family building occupy per plan. | 78 | Completed | New |
| 6549334-CN | 12/12/2016 | 10/28/2019 | Construct an apartment building with live work units occupy per plan. | 78 | Completed | New |
| 6230220-CN | 5/6/2010 | 5/9/2013 | Phase II of II - Construction of a mixed use building including apartments and retail architectural completion of residential and retail portion and occupy per plan. | 78 | Completed | New |
| 6518031-PH | 12/13/2016 | 10/14/2019 | Phased project: Construction of a residential and live/work building with below grade parking and occupy per plan. | 78 | Completed | New |
| 6803855-DM | 7/1/2021 | 11/29/2021 | Demo commercial structure per plan | 78 | Completed | Demolition |
| 6383857-CN | 10/7/2013 | 3/23/2017 | Construct apartment building (East tower) with 6 live-work units and occupy per plan (Establish use as apartments with underground garage and construct 2 new apartment structures with below ground parking/review & process for 2 AP's under #6368859). | 77 | Completed | New |
| 6700752-PH | 12/19/2018 | 11/16/2021 | Phased: New construction of a senior housing community and occupy per plan. | 77 | Completed | New |
| 6595945-PH | 5/29/2018 | 5/31/2022 | Phased project: Construct assisted living facility with below grade parking occupy per plan. Mechanical is included. | 77 | Completed | New |
| 6461659-CN | 1/23/2017 | 5/29/2019 | Construct new mixed use building per plan. | 76 | Completed | New |
| 6584375-CN | 6/11/2017 | 10/12/2021 | Construct a mixed-use structure occupy per plan | 76 | Completed | New |
| 6322630-PH | 10/5/2012 | 1/23/2015 | Phased permit: Construction of a residential building and 5-live-work with below grade parking and occupy per plan. | 76 | Completed | New |
| 6485841-CN | 10/12/2015 | 2/15/2018 | Establish use as and construct new multi-family building and occupy per plan. | 76 | Completed | New |
| 6537284-CN | 7/28/2017 | 12/30/2020 | Construct new multifamily building occupy per plan | 75 | Completed | New |
| 6319992-CN | 5/23/2013 | 5/18/2016 | Establish use as multifamily structure and retail. Construct apartment and retail building with below grade parking and occupy per plan. | 75 | Completed | New |
| 6586757-CN | 8/13/2017 | 7/31/2020 | Construct mixed use apartment building with live/work units retail and parking occupy per plan. | 75 | Completed | New |
| 6424919-CN | 9/2/2014 | 8/19/2016 | Establish use as residential retail and restaurant and construct mixed use building with parking garage and occupy per plan. | 75 | Completed | Addition/Alteration |
| 6347128-CN | 12/24/2012 | 7/16/2015 | Construct north multi-family residential structure and occupy per plans. Construct 3 multi-family residential structuers (reviews and processing for 3 A/Ps under 6303152). | 75 | Completed | New |
| 6211643-CN | 11/19/2010 | 2/26/2014 | Construct six-story mixed use building and occupy per plan. | 75 | Completed | New |
| 6573146-CN | 3/9/2017 | 2/21/2018 | Change of use from assisted living facility to apartment occupy per plan. | 75 | Completed | Addition/Alteration |
| 6482726-CN | 9/2/2015 | 2/7/2018 | Establish use as efficiency dwelling units and construct an apartment building occupy per plans. | 75 | Completed | New |
| 6304741-CN | 6/15/2012 | 4/9/2015 | Establish use as and construct 5-story multifamily building occupy per plans. | 75 | Completed | New |
| 6504245-PH | 2/9/2016 | 2/5/2018 | Construction of a residential building with below grade parking and occupy per plan. | 75 | Completed | New |
| 6287803-CN | 2/26/2013 | 2/13/2015 | Establish use as residential apartments and retail and construct mixed use building and occupy per plan. | 74 | Completed | New |
| 6345134-CN | 1/14/2013 | 9/29/2014 | Establish use as office and multi-family residential apartments. Construct office and apartment building with basement parking and occupy per plans. | 74 | Completed | New |
| 6603184-PH | 9/25/2017 | 4/19/2021 | Phased project: Construct mixed use building with underground parking occupy per plan. | 74 | Completed | New |
| 6327097-CN | 2/4/2015 | 10/26/2018 | Establish use as and construct a mixed use building occupy per plans. | 74 | Completed | New |
| 6378522-CN | 9/25/2013 | 11/19/2015 | Establish use as apartments and retail and Construct new mixed use building with below-grade parking occupy per plan. | 73 | Completed | New |
| 6653033-CN | 6/26/2018 | 2/23/2022 | Establish use and construct assisted living apartment building and occupy per plan. | 73 | Completed | New |
| 6731119-CN | 7/29/2020 | 1/29/2024 | Construct a multi-family building occupy per plans. | 72 | Completed | New |
| 6517111-CN | 10/31/2016 | 5/14/2019 | Construct a multifamily structure occupy per plan. MUP 3022495 Revision 3028409. | 72 | Completed | New |
| 6308587-CN | 3/6/2012 | 4/24/2014 | Establish use as and construct new apartment building with below grade parking occupy per plan. 71 units in 6 story structure | 71 | Completed | New |
| 6497826-CN | 4/21/2016 | 7/11/2018 | Construct new multifamily structure occupy per plan. | 71 | Expired | New |
| 6635484-CN | 4/27/2018 | 10/21/2022 | Construct a new 8-story apartment building with 71 total apartments (66 small efficiency dwelling units and 5 efficiency dwelling units). No parking provided per plan. | 71 | Completed | New |
| 6285529-CN | 5/21/2012 | 2/19/2014 | Construct an apartment building with at grade parking below the structure and occupy per plan. | 71 | Completed | New |
| 6371977-CN | 2/11/2016 | 7/26/2018 | Construct mixed use building and occupy per plan. | 71 | Completed | New |
| 6519858-CN | 8/31/2018 | 4/23/2025 | Construct new multifamily building with below grade parking occupy per plan. | 71 | Completed | New |
| 6614724-PH | 2/5/2018 | 11/17/2022 | Phased project: Construct mixed use building with underground parking occupy per plan. | 71 | Completed | New |
| 6779544-DM | 9/27/2022 | 1/28/2025 | Demolish auto repair garage building and associated accessory building per plan. | 71 | Completed | Demolition |
| 6282064-PH | 5/7/2012 | 4/21/2014 | Phased permit: Construction of a residential building with below grade parking and occupy per plan. | 70 | Completed | New |
| 6524719-CN | 1/20/2017 | 9/26/2018 | Construct mixed use building (Daycare on level 1 and residential above level 2-6) occupy per plan. | 70 | Completed | New |
| 6491637-CN | 10/20/2015 | 8/22/2018 | Establish use as and construct new multifamily structure occupy per plan. | 70 | Completed | New |
| 6173794-CN | 7/14/2011 | 10/3/2018 | Construct apartment retail and office building and occupy per plan. | 70 | Completed | New |
| 6321397-PH | 6/18/2012 | 11/18/2015 | Phased project: Construction of West mixed use building with underground parking and occupy per plan (construction of two mixed use buildings with underground parking - see also 6321396). | 70 | Completed | New |
| 6528917-PH | 9/2/2016 | 7/30/2019 | Construct a new apartment and office building with retail and parking occupy per plan. | 70 | Completed | New |
| 6608071-CN | 12/26/2017 | 2/19/2020 | Construction of residential retail and office building with below grade parking and occupy per plan | 69 | Completed | New |
| 6736100-PH | 9/16/2019 | 7/14/2025 | Phased permit: Construct mixed use apartment building with below grade parking occupy per plan. (Construct mixed use apartment building with below grade parking. Includes shoring soil nails on adjacent site to the south. Review and processing for 2 records under # 6736100-PH.) | 69 | Completed | New |
| 6730663-DM | 6/4/2019 | 5/29/2020 | Demolish existing structure per plan. | 69 | Completed | Demolition |
| 6445306-CN | 7/7/2016 | 3/23/2021 | Construct a multifamily structure occupy per plan. | 68 | Completed | New |
| 6435512-CN | 3/2/2015 | 9/30/2016 | Construct mixed use building with 2-live work and occupy per plan. | 68 | Completed | New |
| 6714534-CN | 12/18/2019 | 2/20/2025 | Establish use as Retail sales and services general per land use code. Construct mixed use building with below-grade parking occupy per plan. | 68 | Completed | New |
| 6360802-CN | 9/30/2013 | 11/20/2015 | Construct mixed use retail and multi-family residential building and occupy per plans | 67 | Completed | New |
| 6764728-CN | 1/26/2021 | 4/8/2024 | Establish use as & construct apartment structure occupy per plan | 67 | Completed | New |
| 6688029-CN | 5/22/2019 | 10/17/2022 | Establish use as apartment and restaurant and construct a mixed-use structure occupy per plan. | 66 | Completed | New |
| 6608783-CN | 12/15/2017 | 3/14/2022 | Construct new apartment building with below-grade parking; occupy per plan. Mechanical is included. | 66 | Completed | New |
| 6691698-CN | 1/22/2019 | 12/16/2021 | Construct apartment building and occupy per plan | 66 | Completed | New |
| 6440370-CN | 1/20/2015 | 9/28/2016 | Construct new mixed use building with enclosed parking occupy per plan. | 66 | Completed | New |
| 6455927-CN | 3/25/2015 | 10/26/2017 | Establish use as multifamily structure and retail and construct mixed occupancy building per plan. | 66 | Completed | New |
| 6625572-CN | 12/20/2019 | 5/10/2022 | Construct new apartment building (Aurora 48) with attached parking occupy per plan. | 66 | Completed | New |
| 6287883-CN | 6/13/2012 | 12/5/2013 | Establish use as residential apartments and retail and construct new mixed use building and occupy per plan. | 66 | Completed | New |
| 6368859-CN | 10/7/2013 | 3/23/2017 | Construct apartment building (West tower) with 8 live-work units and occupy per plan (Establish use as apartments with underground garage and construct 2 new apartment structures with below ground parking/review & process for 2 AP's under #6368859). | 66 | Completed | New |
| 6401048-CN | 5/29/2014 | 12/12/2016 | Establish use as and construct residential building 4 live-work with below grade parking per plans. | 65 | Completed | New |
| 6325991-CN | 6/13/2013 | 2/25/2016 | Construct a mixed use commercial and residential building and occupy per plan. | 65 | Completed | New |
| 6563283-CN | 1/3/2017 | 3/4/2019 | Establish use as and construct new apartment building occupy per plan. | 64 | Completed | New |
| 6324483-CN | 12/11/2014 | 3/2/2017 | Construct a 4-story apartment building with (64) units (36) underground parking spaces (48) secure bicycle storage spaces rooftop deck and internal courtyard. | 64 | Completed | New |
| 6573426-CN | 6/6/2018 | 7/9/2021 | Construct apartment building with live/work units and attached parking. Includes work in the ROW. New Sewer Connection to the main. Existing side sewer to be reused for drainage. | 63 | Completed | New |
| 6518219-CN | 12/23/2016 | 7/11/2019 | Change use from restaurant to office establish use as apartment retail and restaurant construct additions and substantial alterations to mixed use building occupy per plan. | 63 | Completed | Addition/Alteration |
| 6153042-CN | 4/20/2012 | 12/12/2013 | Construct a 4 story mixed use development with 3 floors of residential space above 1 floor of commercial and parking space occupy per plan. | 63 | Completed | New |
| 6395391-CN | 10/5/2015 | 8/5/2019 | Construction of residential and retail building occupy per plan | 63 | Completed | New |
| 6979176-CN | 10/6/2023 | 6/26/2024 | Construct alterations to existing multifamily building on the 11th floor to combine units 1102 and 1103 occupy per plan. | 62 | Completed | Addition/Alteration |
| 6415053-CN | 6/19/2014 | 11/2/2016 | Substantial alteration to existing north side retirement home with new addition and occupy all per plans. | 62 | Completed | New |
| 6270901-CN | 7/27/2011 | 11/16/2012 | Construct apartment building and occupy per plans. | 62 | Completed | New |
| 6383128-CN | 3/20/2014 | 3/23/2017 | Change of use from parking to apartments general retail and parkin. Construct mixed use building with below grade parking garage and occupy per plan. | 62 | Completed | New |
| 6582741-CN | 5/15/2017 | 6/2/2021 | Construct a multi-family structure occupy per plan. | 61 | Completed | New |
| 6737277-CN | 12/8/2020 | 1/5/2024 | Construct affordable housing apartment building occupy per plan. Mechanical included this permit | 61 | Completed | New |
| 6274311-CN | 4/8/2011 | 3/1/2013 | Construct an apartment building (low-income elderly housing) and occupy per plan. | 61 | Completed | New |
| 6213875-PH | 5/19/2011 | 2/22/2013 | Phased project: Construction of a retail and residential building and occupy per plan. 3 phases: Ph.I shoring and excavation (6279253); Ph.II foundation and first floor slab 2nd of bldg B north (6279255); Ph.III structural and architectural completion (6279256). | 61 | Completed | New |
| 6426748-PH | 8/8/2014 | 8/17/2017 | Construct a new residential building with below grade parking and occupy per plan. | 61 | Completed | New |
| 6471544-CN | 6/23/2016 | 7/13/2018 | Establish use as residential multifamily and general retail sales and service and construct new mixed-use structure occupy per plan. | 61 | Completed | New |
| 6691151-DM | 6/10/2019 | 6/27/2024 | Demolish existing structure per plan. | 60 | Completed | - |
| 6553954-CN | 11/30/2017 | 3/1/2021 | Construct new Mixed Use residential building occupy per plan. | 60 | Completed | New |
| 6808675-CN | 3/8/2021 | 10/17/2025 | Establish use as retail and residential building construct multi-family and retail building and occupy per plans. Mechanical is included. | 60 | Completed | New |
| 6367473-CN | 7/29/2013 | 5/30/2017 | Establish use as retail and residential. Construct mixed use building with below-grade parking garage and occupy per plans. | 60 | Completed | New |
| 6366532-CN | 6/5/2014 | 10/30/2017 | Construct new residential and retail building with below grade parking and occupy per plans. | 60 | Completed | New |
| 6317587-CN | 5/20/2013 | 3/31/2016 | Construct apartment building and occupy per plan. | 60 | Completed | New |
| 6391378-CN | 5/16/2014 | 7/21/2017 | Establish and construct new 60 unit apartment building and occupy per plan. | 60 | Completed | New |
| 6300093-CN | 1/15/2013 | 1/20/2015 | Establish use as and construct a multifamily residence with under ground parking occupy per plan. | 60 | Completed | New |
| 6690486-CN | 1/25/2019 | 12/14/2021 | Construct 7-story multi-family structure with 58 small efficiency dwelling units. Occupy per plan. | 60 | Completed | New |
| 6600659-CN | 1/4/2018 | 10/13/2021 | Construct a residential and restaurant building occupy per plan. | 60 | Completed | New |
| 6514054-PH | 3/29/2016 | 6/13/2019 | Construct a new mixed-use building with apartments and ground floor retail and occupy per plan. | 60 | Completed | New |
| 6574965-CN | 5/24/2017 | 6/5/2019 | Construct a multifamily structure with below grade parking occupy per plan. | 59 | Completed | New |
| 6432244-CN | 8/18/2014 | 8/9/2016 | Construction of West residential (day care) and retail building and occupy per plan. | 59 | Completed | New |
| 6586498-CN | 5/19/2017 | 11/1/2019 | Construct new mixed used building with residential and commercial occupy per plan. | 59 | Completed | New |
| 6308564-CN | 2/28/2012 | 9/10/2014 | Construct a new low income senior apartment building with 58 units in a four story building of approx 58 000 sf and occupy per plan. Surface parking provided. | 58 | Expired | New |
| 6677403-CN | 8/16/2019 | 7/9/2024 | Establish use and construct multi-family structure occupy per plan. | 58 | Completed | New |
| 6429608-CN | 11/25/2014 | 3/31/2017 | Construction of above grade mixed use building on below grade parking structure (see also 6415654 for construction of live-work and residential building) and occupy per plan. | 58 | Completed | New |
| 6745835-DM | 4/24/2020 | 9/6/2023 | Demo existing commercial building per plan. . | 58 | Completed | Demolition |
| 6487144-CN | 2/11/2016 | 9/6/2018 | Substantial alterations throughout existing multi-family structure to create 55 congregate sleeping units and 57 small efficiency dwelling units and occupy per plans. | 58 | Completed | Addition/Alteration |
| 6446933-CN | 11/9/2015 | 8/30/2017 | Establish use as and construct new multifamily structure (small efficiency dwelling units) and occupy per plan. | 58 | Completed | New |
| 6717672-CN | 7/17/2019 | 12/28/2023 | Establish use as residential construct a multifamily building and occupy per plans. | 58 | Completed | New |